Carol & Lee Dunn Deck

We did a lot of work at the Dunn's. We installed the gutter helmet to their gutters. We painted the cedar siding on the trailer using a "stain" paint. We built a deck on the front of their trailor and put new stairs and rails on the back existing deck. We then built a walkway connecting the two. We installed indoor/outdoor carpet on the small front existing landing and the side existing deck.

This is Carol and Lee Dunn on their new deck.
Carol passed in 05' and will be missed dearly.


The deck faces the driveway so we designed the stairs to recess into the deck. This allows for more parking space and keeps the stairs from being hit by vehicles.

   
This is the front of the trailer before we did anything.
   
This is the side existing deck before we did anything.

First we framed the main deck.

Then we installed the decking

Follow by posts and rails, after the skirt.

Main deck all done but staining.

All ready to relax.

All stained up.

New enclosed stairs, posts and railing.

All stained up.

Later a walk was added . . .

to connect the two decks.

Pictures coming soon of completed walk.